theelanman Posted May 13, 2015 Posted May 13, 2015 I have got this list of cameras anyone know if theyre all included?....... Motorway Junction to Junction M1 13 19 24 25 28 31 32 35a 39 42 M3 2 4a 9 14 M4 3 12 M6 2 4 4a 6 10a 13 13 15 16 19 21a 26 M20 3 5 M23 8 10 M27 4 11 M56 6 8 M60 8 12 12 15 24 27 M62 10 12
M@r]{ Posted May 13, 2015 Posted May 13, 2015 What? Are you saying there are stealth cameras at all of these locations?!
theelanman Posted May 13, 2015 Author Posted May 13, 2015 What? Are you saying there are stealth cameras at all of these locations?! yep......
M@r]{ Posted May 13, 2015 Posted May 13, 2015 Where are you getting this from? I travel a few of those regularly and if that's true if I'm not already screwed I will be!
theelanman Posted May 13, 2015 Author Posted May 13, 2015 http://www.telegraph.co.uk/news/uknews/road-and-rail-transport/11375836/Stealth-speed-cameras-to-be-deployed-on-300-miles-of-motorway.html
kieranexige Posted May 13, 2015 Posted May 13, 2015 M1 24-25 I don't think is right. I'm sure they all start 25 + . I do drive it everyday so may have missed them putting them up. I have noticed the new vector camera on the m18 just before it joins the m1 South at Sheffield . Tiny little yellow box
scatty Posted May 13, 2015 Posted May 13, 2015 I think they are installing from j28 to 31 but deffo not complete yet...they have just put the gantries up. I think all the purple cable on top of the barriers is for this.. There are new stealth cameras from j26 onwards, grey cameras hung on the outside of the gantries. I wasn't aware of any from j24/25..,
Smithy16 Posted May 13, 2015 Posted May 13, 2015 M6 15 to 13 and 13 to 10a not up and running yet but not far off completion. Up and down this stretch everyday so when active I will post again.
theelanman Posted May 14, 2015 Author Posted May 14, 2015 the list I had was from January and as theres not too much involved in the installation as they are just a bracket on an evisting gantry and the power is also there too........so the planning list is now a construction list.......so wont be long before theyre all up and running...... I get the feeling Im going to be welcoming the good old A road........(I try to avoid motorways as it is.....nut even more so in the future)
Recommended Posts
Archived
This topic is now archived and is closed to further replies.